China-side operations. International delivery. Start with the work you need.

Industry services

Building and outdoor materials logistics

Organise material specifications, supplier arrivals and delivery requirements around your project.

Project materials can arrive from different suppliers in different formats. Send the schedule of materials with specifications and quantities. Identify the goods that should travel together and any batches needed at separate stages. Those instructions help define purchasing, receiving and consolidation work in China.

Lengths, packed sizes and weight affect handling and transport. Tell us about fragile surfaces, moisture protection or other packing needs. Reference drawings and agreed tolerances can support a defined inspection. Include the finish or colour reference where it matters to the release decision.

The receiving site needs a delivery plan of its own. Share access restrictions, unloading facilities and the delivery window. The proposal identifies the agreed packing, shipment and destination arrangements. Product or project documents should be supplied for the material and destination concerned. Any site work is reviewed as a specific requirement.

Typical China-side work

  • Material-list purchasing and supplier coordination
  • Agreed specification and appearance checks
  • Protective packing and multi-supplier consolidation
  • Batch dispatch and receiving-site delivery planning

Keep material lots and delivery phases identifiable

Match the specification to each material lot

List dimensions, material, finish and quantity by supplier or batch. Share the reference and tolerances for any checks. A mixed project list needs identifiers that remain usable through receiving and packing.

Plan protection around the item's shape

Describe long lengths, fragile surfaces and moisture or corrosion concerns. Confirm the packing and resulting size or weight before a handling and transport proposal is accepted.

Set the release order for the receiving site

Group materials by the delivery phase or location where they are needed. State site access, unloading and appointment requirements. Agree any holding or split-dispatch work rather than assuming every supplier arrival should ship immediately.

What to record in the agreed instruction

  • The project material list, batch identifiers and agreed specification checks.
  • The protection and packing instructions, including measurements for long or heavy units.
  • The shipment groups, release authority and receiving-site handling to be included or quoted separately.

Questions before you start

Can materials be grouped by project or delivery phase?

Provide the groupings and readiness dates with the supplier list. We agree how goods should be identified, held and released for each shipment. Storage and handling form part of that proposal.

Can the delivery go to a construction site?

Share the exact address, access conditions and unloading arrangements. The proposed final-delivery service needs to match those details. Any lifting or site handling is confirmed in the agreed scope.

Start with the task

Tell us what you need to move.

Start with a product link or a short description. Add the details you already know.

Prepare a request

Review your draft, then share it by email or chat.

Contact us directly