China-side operations. International delivery. Start with the work you need.

Industry services

Machinery and engineering equipment logistics

Connect equipment specifications, inspection instructions and packed-cargo handling in one inquiry.

Start with the equipment model, specification and the work you need in China. Purchasing, supplier coordination, inspection, assembly and packing can be discussed together. Drawings, a parts list or an accepted sample help define the instruction. Identify the checks needed before the equipment is released.

Packed dimensions and weight affect collection and transport planning. Include any lifting points, handling limits and site information already available. Tell us about batteries, oils or other components that may affect the proposed handling. Existing product and transport documents can be added to the inquiry.

Packing may need protection against movement, moisture or surface damage. The final delivery also depends on access and unloading arrangements at the receiving site. These requirements are confirmed for the particular equipment. The proposal separates the agreed China-side work, international movement and any additional destination services.

Typical China-side work

  • Equipment purchasing and supplier coordination
  • Agreed inspection and assembly work
  • Packing, protection and cargo consolidation
  • Collection and receiving-site delivery planning

Quote the equipment as it will be checked and moved

Identify the machine and its separate parts

Give the model, quantity, new or used condition and the parts or accessories included. Identify any requested light assembly separately from site installation or commissioning so the proposed work can be assessed.

Describe the packed lifting and receiving needs

Provide packed dimensions, weight and any known lifting or handling requirements. Include the collection and receiving-site arrangements, with drawings or photos where available, so the packing and movement scope can be reviewed together.

Define what the equipment check should establish

Distinguish appearance and parts-list checks from a requested functional test. Supply the test method, power or equipment needs and acceptance criteria. Feasibility and reporting need agreement before the test is included in the quote.

What to record in the agreed instruction

  • The equipment specification, condition, accessory list and assembly work requested.
  • The agreed inspection or test coverage, required resources and evidence for the release decision.
  • The packing reference, measurements and collection or unloading tasks accepted in the transport proposal.

Questions before you start

Can assembly be included before the equipment ships?

Send the drawing, parts list and required result. We confirm the work, tools and checks for the specific equipment. Any site installation or commissioning requirement should be described separately.

What if the final packed dimensions are still unknown?

Share the supplier figures and mark them as provisional. Packing and transport need confirmed measurements before the movement is finalised. Tell us if a packing assessment is part of the requested work.

Start with the task

Tell us what you need to move.

Start with a product link or a short description. Add the details you already know.

Prepare a request

Review your draft, then share it by email or chat.

Contact us directly